Product data and details.
Six PDFs are posted: product overviews, installation guides, and PDF reference details for AP and CP. Contact us for project specification support.
Specification
Flexus pavement is an exterior walking surface. A project manual may place that work in CSI Division 32, Exterior Improvements.
Contact us for project specification support.
Stormwater
The install guides describe a surface that passes water into the base when the subgrade is prepared for it. A designer may use that section in a low-impact or municipal stormwater plan. Whether it counts as a credited best management practice, including any MS4 or runoff credit, is decided by the reviewing authority. Flexus is not pre-approved by a stormwater agency.
- Base. Open-graded aggregate. The reference details show a typical 4 inch ASTM No. 57 base and an optional 6 inch ASTM No. 2 subbase. The engineer of record sets the real section.
Procurement
Landscape architects, park planners, and owners specify Flexus. Flexus Materials Ltd Co sells the pavement system and the rubber surfacing materials. Supply only, with install guidance for your contractor, or supplied and installed by Flexus.
- Posted. Product overviews, installation guides, and PDF reference details.
- Warranty. The install guides say that changing the approved mix ratio voids the system warranty. Contact us for project specification support.
Contact us for project pricing.
Installation
Supply only, with install guidance for your contractor, or supplied and installed by Flexus.
- Guidance, not a substitute for the engineer. The guides cover pedestrian scope, subgrade, aggregate base, edges, weather, mixing, placement, cure, and repair. Subgrade compaction in the guides is a minimum of 95 percent Standard Proctor (ASTM D698). Recommended surface slope is 1 to 2 percent where positive drainage is required.
- Edges. A rigid edge is described where the surface stands above adjacent grade. A beveled, backfilled edge is described where the surface is confined below grade. The PDF details say the same thing, and each sheet says it is not for construction without a registered engineer's signature.
- Weather and cure, from the guides. Ambient and substrate temperature 50°F and rising, and not more than 104°F. No precipitation during installation. Initial set 4 to 8 hours. Light pedestrian traffic after 24 hours minimum. Full cure 48 to 72 hours. Working time about 20 minutes at 70°F.
- Accessibility. The guides say a properly installed surface may support ADA slope conditions, with a recommended maximum cross slope of 2 percent. Final compliance is the designer's responsibility.
Downloads
These six files are on the site. Reference details are illustrations at no particular scale.